Apply small rudder corrections against a point at the far end of the runway to hold the centreline during the roll.
What happened: The aircraft tracked 5.9 m off the runway centreline during the ground roll, and flights with this pattern usually carry extra bank, around 2.9°, into the first climb.
Watch for: Heading indicator: wings level, tracking the runway centreline
Twenty knots on a monitor produces the visual sensation of about ten. The advice to "taxi at a walking pace" cannot fix this, because your sense of walking pace is exactly the thing that's broken. Put the groundspeed readout in your scan and obey it for the next fifty flights, the way a student pilot leans on the airspeed indicator before learning to read attitude.
Read more in How to Taxi AnywhereStart to finish · 28 stages, 26 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
Two stabilised approach gates, each with seven checks, where the approach path is 1,000 ft and 500 ft above the runway.
The approach, gate by gate
Side view — the last 1,651 m of the approach.
Plan view — the first 1,651 m of the 2,820 m runway, to the same scale as the side view.
Touched down 565 m past the threshold — beyond the full-score zone. The arrival was smooth.
The rest of the report
The flight in question was operated by a Boeing 777-300 aircraft. The aircraft began its journey by taxiing from the parking area to the runway, a process that took 10 minutes and covered a distance of 5 nautical miles. Departure from London Heathrow Airport (EGLL) took place from runway 09R, with a takeoff distance of 1,312 meters, which accounted for 39% of the runway. The aircraft lifted off at a speed of 184 knots.
The initial climb phase started approximately 1 mile north-west of Feltham, Greater London, England, where the aircraft ascended from 1,080 feet above sea level to 6,110 feet above sea level, an increase of 5,030 feet in just 2 minutes, covering a distance of 8 nautical miles. The enroute level cruise phase began 1 mile north-west of Morden, Greater London, England, and lasted for 7 minutes, covering a distance of 32 nautical miles.
The aircraft then entered another climb phase, this time from 2 miles south-west of Bredgar, Kent, England, where it ascended from 6,881 feet above sea level to 32,970 feet above sea level, an increase of 26,089 feet in 12 minutes, covering a distance of 89 nautical miles. The enroute level cruise phase resumed overhead Handzame, Flanders, Belgium, and lasted for 14 minutes, covering a distance of 119 nautical miles.
The aircraft continued to climb from 2 miles west of Robertville, Wallonia, Belgium, where it ascended from 32,989 feet above sea level to 34,962 feet above sea level, an increase of 1,974 feet in 3 minutes, covering a distance of 26 nautical miles. The enroute level cruise phase resumed overhead Uxheim, Rheinland-Pfalz, Germany, and lasted for 89 minutes, covering a distance of 725 nautical miles.
The aircraft then entered another climb phase from 1 mile east of Zubin Potok, Mitrovica District, Kosovo, where it ascended from 35,267 feet above sea level to 36,987 feet above sea level, an increase of 1,720 feet in 2 minutes, covering a distance of 14 nautical miles. The enroute level cruise phase resumed 5 miles south of Vushtrri, Mitrovica District, Kosovo, and lasted for 263 minutes, covering a distance of 1,884 nautical miles.
The aircraft continued its journey, entering another climb phase from 44 miles south-west of OIBK Kish International Airport, Kish Island, Hormozgan Province, Iran, where it ascended from 36,533 feet above sea level to 38,517 feet above sea level, an increase of 1,984 feet in 3 minutes, covering a distance of 27 nautical miles. The enroute level cruise phase resumed 30 miles west of OIBS Siri Airport, Siri, Hormozgan Province, Iran, and lasted for 132 minutes, covering a distance of 1,017 nautical miles.
As the aircraft approached its destination, it began its descent from 37 miles south-east of Diu, Dadra and Nagar Haveli and Daman and Diu, India, where it descended from 38,550 feet above sea level to 11,569 feet above sea level, a decrease of 26,981 feet in 14 minutes, covering a distance of 93 nautical miles. The enroute level cruise phase resumed 10 miles west of Borivli, State of Maharashtra, India, and lasted for 5 minutes, covering a distance of 27 nautical miles.
The aircraft then entered its final descent phase, descending from overhead Amarnath, State of Maharashtra
The Boeing 777-300 aircraft successfully landed at Chhatrapati Shivaji International Airport, achieving a high score of 97.3%. The final approach to runway 27 was executed from the east, with a heading of 270.0° at a distance of 4 nautical miles and an altitude of 1,276 feet above ground level.
The aircraft touched down on the runway with a good threshold height, and the threshold speed was also satisfactory at 127 knots. The touchdown point was located 167 meters beyond the designated touchdown zone, which is slightly outside the recommended area. However, the touchdown speed of 124 knots was within the acceptable range, and the touchdown rate of -168 feet per minute was also good.
The local weather conditions at the time of landing were favorable, with a temperature of 26°C and a wind speed of 8 knots from a direction of 240°. The crosswind component was minimal at 4 knots, while the headwind component was 7 knots. These conditions contributed to a smooth landing.
The total landing distance of 1,589 meters was 56% of the available runway length, which is a relatively short distance considering the aircraft's size and weight. The runway rollout alignment was excellent, indicating that the pilot maintained good control of the aircraft during the landing roll.
Overall, the landing was successful, and the pilot demonstrated good skills and judgment in executing the approach and landing. However, there is room for improvement in terms of touchdown point accuracy and alignment with the runway centerline.