Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Improve the rollout
Ground control varies with speed, full authority at walking pace, progressively reducing as groundspeed rises. The aircraft becomes twitchy at any speed, every small pedal input swings the nose, which can encourage large-amplitude leg inputs that no real aircraft would accept.
Read more in How to Taxi AnywhereStart to finish · 19 stages, 17 scored
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: five checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out.
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 2,253 m runway, to the same scale as the side view.
Touched down 577 m past the threshold — beyond the full-score zone. The arrival was smooth.
The rest of the report
Overall, you should be proud of achieving a landing score of 92.9%! Your approach phase was particularly strong with excellent glideslope alignment, indicating precise control and judgment. This is a critical aspect of a successful landing and you should continue to focus on maintaining this level of performance.
During the landing phase, you exhibited good threshold height and fair landing flare, showing good judgment in terms of altitude and descent rate. However, there were some areas for improvement, such as poor bank angle stability during landing. This is an important area to work on as it can impact the smoothness and safety of the landing.
In the touchdown phase, it's great that you had a firm touchdown rate, but the speed was slightly above target. It's important to aim for the desired speed to ensure a smooth and controlled touchdown. Additionally, the touchdown point being 157 m beyond the touchdown zone is a significant deviation and something to work on for future landings.
The runway touchdown position being 3.5 m from the centerline is another area to focus on for better alignment and precision during landings. Lastly, in the rollout phase, the runway alignment being 11.4 m from the centerline is something that can be improved with more practice and focus on maintaining a straight path down the runway.
Overall, your landing was solid with many positive aspects to build on. Keep working on those areas for improvement and continue to strive for excellence in all phases of the landing process. With dedication and practice, you will no doubt see even better results in upcoming flights. Great job on your achievement!
Scroll or drag the slider to zoom · double-click to reset · hover for values