Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Check your taxi lights
Don't forget to turn on the taxi lights at the start of the taxi stage and switch to landing lights as soon as you enter the runway.
Start to finish · 20 stages, 19 scored
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: five checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out.
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 3,501 m runway, to the same scale as the side view.
The 411 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Overall, this aircraft landing had a very successful Approach Phase with great glideslope alignment, heading alignment, and speed control. The Landing Phase was also executed well with a good threshold height and perfect landing flare. The Touchdown Phase had a fair touchdown rate, but the speed was on target and the distance was very good. The runway alignment during the Touchdown Phase was fair as well.
During the Rollout Phase, the runway alignment was fair, indicating some room for improvement in this aspect of the landing. However, overall, the landing can be considered successful with the key phases of the landing process being executed well. With some minor adjustments to the touchdown rate and runway alignment during the Rollout Phase, the landing could be further improved.
Scroll or drag the slider to zoom · double-click to reset · hover for values