Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Configure earlier
Preparing for a stable approach will give you time to decide on whether to attempt the landing or going around. Too much altitude with a high sink rate will result in carrying too much speed onto the runway. Configuring flaps and the gear late also won't help the speed decay.
Read more in The Stabilised ApproachStart to finish · 23 stages, 21 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
Two stabilised approach gates, each with six checks, where the approach path is 1,000 ft and 500 ft above the runway.
At the 1,000 ft gate: sink rate above what the glideslope needed, off the runway's 3° glideslope and speed above the reference speed.
At the 500 ft gate: off the runway's 3° glideslope.
The approach, gate by gate
Side view — the last 1,334 m of the approach.
Plan view — the full 1,334 m runway, to the same scale as the side view.
The 258 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Departing from Paris-Beauvais Airport, the aircraft rolled down runway 30, accelerating to a liftoff speed of 146 kt. The takeoff distance of 822 meters, which accounted for 35% of the runway, was achieved in a relatively short period. The local weather conditions at the time of departure featured a temperature of 12 °C and a wind of 17 kt at 309 °, resulting in a 17 kt headwind.
As the aircraft climbed to its enroute cruise altitude, it passed over several notable points, including Tille, Arrest, and Fort-Mahon-Plage. The climb phase was characterized by a significant increase in altitude, from 1,424 ft to 24,008 ft, in just 9 minutes and covering 46 nm. The aircraft then transitioned into a series of level cruises, each lasting around 2 minutes, as it traversed the English Channel. The descent phase began over Fort-Mahon-Plage and continued until the aircraft reached its final approach altitude over the Channel gliding club Dover. The final approach to runway 27 at London City Airport was executed from the east, with a heading of 273.0 ° at 3 nm and 1,932 ft agl.
The landing was completed on runway 27, with a touchdown distance of 258 meters, which was well within the available runway length of 1,334 meters. The touchdown speed of 119 kt was slightly above the target, while the touchdown rate of -385 fpm was firm. The runway touchdown alignment was very good, and the runway rollout alignment was also satisfactory. Following the landing, the aircraft taxied to the parking area in just 1 minute, covering less than 1 nm. The total flight distance of 182 nm was achieved in 50 minutes, with a fuel consumption of 614 kg.
The aircraft, C750, initiated its final approach to runway 27 at EGLC London City Airport from the east, aligning with a heading of 273.0° at a distance of 3 nautical miles and an altitude of 1,932 feet above ground level. The approach quality was satisfactory, with a good threshold height achieved. However, the threshold speed was slightly above the target, reaching 127 knots.
Upon touchdown, the aircraft demonstrated a good touchdown distance of 258 meters, but the touchdown speed of 119 knots was slightly faster than desired. The touchdown rate was firm, at -385 feet per minute. Notably, the runway touchdown alignment was very good, indicating precise control during the landing phase. The local weather conditions, with a temperature of 11°C and a wind of 13 knots at 239°, contributed to a crosswind of 7 knots and a headwind of 11 knots.
The total landing distance of 676 meters, accounting for 51% of the runway length, was within acceptable limits. The runway rollout alignment was also very good, demonstrating the pilot's ability to maintain control and stability during the critical phases of the landing. Overall, the landing performance of C750 scored 94.1%, reflecting a high level of proficiency and adherence to standard operating procedures.
Scroll or drag the slider to zoom · double-click to reset · hover for values