Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Departure
Make small rudder corrections against a point at the far end to hold the centreline.
What happened: During the ground roll you drifted 7 m off the runway centreline.
Watch for: Watch runway alignment against the centreline, correcting with small rudder inputs.
See Departure Roll
Arrival
Use small rudder inputs against a point at the far end of the runway to hold the centreline during rollout.
What happened: During the rollout the aircraft drifted 12 m off the centreline.
Watch for: Runway centreline marks: hold the aircraft tracking straight down the centreline through rollout
See Arrival Rollout
Ground control varies with speed, full authority at walking pace, progressively reducing as groundspeed rises. The aircraft becomes twitchy at any speed, every small pedal input swings the nose, which can encourage large-amplitude leg inputs that no real aircraft would accept.
Read more in How to Taxi AnywhereStart to finish · 15 stages, 13 scored
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
Two stabilised approach gates, each with seven checks, where the approach path is 1,000 ft and 500 ft above the runway. They are the approach's score: the checks passed out of the checks that ran.
The approach, gate by gate
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 2,694 m runway, to the same scale as the side view.
The 369 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
The FSReborn-flown Phenom 300E Oberon taxied from the parking area to the departure runway in 4 minutes, covering less than 1 nm.
The aircraft departed runway 24 at EDNY Friedrichshafen Airport, applying a takeoff roll of 561 m (26 % of the runway) and achieving liftoff at 125 kt. Ambient conditions were 26 °C with a wind of 8 kt from 149°, resulting in an 8 kt cross-wind component and no head-wind.
Climb commenced overhead Friedrichshafen, Germany, with the altitude increasing from 2,366 ft asl to 24,392 ft asl - a gain of 22,026 ft - over 7 minutes while covering 38 nm.
Level cruise began over Riedlingen, Germany, and persisted for 9 minutes, during which the aircraft travelled 73 nm.
Descent was initiated 1 mile north-west of Feuchtwangen, Bavaria, descending from 24,308 ft asl to 2,309 ft asl - a loss of 21,999 ft - in 15 minutes and covering 78 nm.
The final approach to runway 28 at EDDN Nuremberg Airport was flown from the east, on a heading of 278.0° at 4 nm and 1,267 ft agl.
Landing on runway 28 was executed on a runway 2,694 m long; the threshold speed was 111 kt. Touchdown occurred at 104 kt after a distance of 367 m, with a firm touchdown rate of minus 378 fpm and a lateral deviation of 4.1 m from the centreline. Weather at the time was 25 °C with a wind of 13 kt from 300°, giving a 5 kt cross-wind and a 12 kt head-wind. The total landing distance measured 1,235 m, representing 46 % of the runway, and the rollout alignment was offset by 12.5 m from the centreline.
After exiting the runway, the aircraft taxied to the parking area in 2 minutes, covering less than 1 nm.
In total, the flight covered 194 nm, required 40 minutes, and consumed 309 kg of fuel.
The final approach to runway 28 at EDDN Nuremberg Airport was conducted from the east on a heading of 278.0° at 4 nm and 1,267 ft agl. The approach was assessed as stabilised at the 1,000 ft gate, with gear, flaps, sink rate, glideslope and centreline all within limits.
During the threshold and flare segment the aircraft maintained a good threshold speed of 111 kt and a good touchdown distance of 367 m. The flare produced a touchdown speed of 104 kt, which was also judged good.
Touchdown occurred with a firm rate of -378 fpm. Lateral alignment at touchdown was slightly misaligned by 4.1 m from the centreline. Total landing distance was 1,235 m, representing 46 % of the 2,694 m runway.
Rollout alignment was slightly misaligned by 12.5 m from the centreline. The aircraft continued the rollout within the remaining runway length without further deviation.
Maintain tighter lateral control to keep the aircraft within a few metres of the centreline on touchdown and throughout rollout. Refine heading adjustments during flare and after touchdown to reduce the observed 4.1 m and 12.5 m deviations.
Scroll or drag the slider to zoom · double-click to reset · hover for values