Events
Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Arrival
Track the centreline through touchdown using small rudder corrections against a point at the far end of the runway.
What happened: The aircraft touched down off the centreline at 13 m, and drifting off centreline at touchdown usually carries through into the rollout, as it did here with alignment reaching 21 m.
Watch for: Watch runway centreline position, keeping deviation inside the limit through touchdown and rollout.
A crosswind landing is a geometry problem. The air mass you're flying in is moving sideways across the runway, and you need your ground track down the centreline with your wheels aligned to it at the moment of contact. There are two techniques that will help, the crab and the sideslip.
Read more in Crosswind Landings in the SimStart to finish · 15 stages, 13 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
Two stabilised approach gates, each with seven checks, where the approach path is 1,000 ft and 500 ft above the runway. They are the approach's score: the checks passed out of the checks that ran.
The approach, gate by gate
Side view — the last 1,637 m of the approach.
Plan view — the first 1,637 m of the 3,530 m runway, to the same scale as the side view.
Touched down 760 m past the threshold — beyond the full-score zone. The arrival was smooth.
The rest of the report
The Boeing 737-700 taxied from the parking area to runway 30 at KIAD Washington Dulles International Airport, a movement that required 10 minutes and covered 2 nm.
During the departure roll on runway 30, the aircraft accelerated to a liftoff speed of 145 kt and left the ground after traveling 1,615 m, which represented 51 % of the runway length. Ambient conditions were a temperature of 29 °C, wind from 059° at 8 kt, a 6 kt cross-wind component and a 5 kt tail-wind component.
Climb commenced 1 mile north of South Riding, Virginia, with the airplane climbing from 1,274 ft asl to 37,995 ft asl, an altitude gain of 36,721 ft achieved in 18 minutes while covering 111 nm.
Level cruise began 6 miles north-east of Junior, West Virginia, and was maintained for 48 minutes, during which the aircraft flew 309 nm.
Descent was initiated 2 miles north-east of Winona Lake, Indiana, with a reduction from 37,998 ft asl to 1,958 ft asl, a loss of 36,040 ft over 23 minutes and a distance of 116 nm.
The final approach to runway 27C at KORD Chicago O’Hare International Airport was conducted from the east, on a heading of 270.0°, at 4 nm and 1,278 ft agl.
Landing on runway 27C, whose total length is 3,530 m, occurred with a threshold height of 75 ft agl and a threshold speed of 140 kt, both noted as above target. Touchdown was recorded 345 m beyond the designated touchdown zone, at a speed of 124 kt and a vertical rate of minus 177 fpm. The touchdown point was offset 12.7 m from the centreline, and the total landing distance measured 1,558 m, representing 44 % of the runway. Local weather at the time was 26 °C, wind from 130° at 11 kt, with a 7 kt cross-wind and an 8 kt tail-wind component.
Runway rollout alignment was observed to be misaligned by 20.6 m from the centreline.
After landing, the aircraft taxied from the runway to the parking area in 6 minutes, covering a distance of 1 nm.
In total, the flight covered 546 nm, required 105 minutes of airborne time, and consumed 3,764 kg of fuel.
The Boeing 737-700 executed the final approach to runway 27C at KORD Chicago O’Hare International Airport from the east, maintaining a heading of 270.0° at 4 nm and 1,278 ft agl. Local weather was 26 °C with wind 11 kt from 130°, a 7 kt crosswind component and an 8 kt tailwind component.
At the threshold the aircraft was 75 ft agl, which was well above target, and the threshold speed was 140 kt, also well above target.
Touchdown occurred 345 m beyond the touchdown zone with a speed of 124 kt, which was a little fast, and a vertical rate of minus 177 fpm, which was good. The touchdown position was misaligned by 12.7 m from the centreline.
The total landing distance was 1,558 m, representing 44 % of the 3,530 m runway, and rollout alignment was misaligned by 20.6 m from the centreline.
Refine the approach to achieve the target threshold height and speed, and aim to place the main gear within the designated touchdown zone to reduce the overshoot distance. Improving centreline alignment during rollout will further enhance runway utilization and safety.
Scroll or drag the slider to zoom · double-click to reset · hover for values