Flight Score
Departure
Make small rudder corrections against a point at the far end to hold the centreline.
What happened: During the ground roll you drifted 18 ft off the runway centreline.
Watch for: Watch runway alignment against the centreline, correcting with small rudder inputs.
See Departure Roll
Start to finish · 24 stages, 23 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
Two stabilised approach gates, each with seven checks, where the approach path is 1,000 ft and 500 ft above the runway.
The approach, gate by gate
Side view — the last 5,000 ft of the approach.
Plan view — the first 5,000 ft of the 10,504 ft runway, to the same scale as the side view.
The 973 ft touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Departing from Hartsfield Jackson Atlanta International Airport (KATL), the Airbus A350-900 began its journey on runway 27R, taking off with a distance of 6,079 feet, which accounted for 51% of the runway. The aircraft lifted off at a speed of 157 knots, and the local weather conditions at the time were characterized by a temperature of 67°F.
As the aircraft climbed to its initial cruising altitude, it traversed a significant distance, covering 238 nautical miles in 32 minutes and increasing its altitude by 34,988 feet to 37,000 feet above sea level. The enroute level cruise phase that followed lasted 94 minutes, during which the aircraft covered 818 nautical miles. The flight then underwent a series of climbs and level cruises, with notable increases in altitude and decreases in time, as it transitioned from the North American to the European and eventually the Greek airspace. The final descent phase began 1 mile north of Kyrtoni, Central Greece, where the aircraft descended from 41,002 feet to 3,000 feet above sea level in 14 minutes, covering 100 nautical miles.
The Airbus A350-900 then entered the final approach phase, aligning itself with runway 21R at Athens Eleftherios Venizelos International Airport (LGAV) from the north-east, with a heading of 217.0° at 4 nautical miles and 1,342 feet above ground level. The aircraft landed successfully on the runway, with a touchdown distance of 965 feet and a touchdown speed of 128 knots. The total landing distance was 3,638 feet, accounting for 35% of the runway. Following a smooth rollout, the aircraft taxied to the parking area, concluding its journey of 5,130 nautical miles, which took a total of 619 minutes and utilized 128,006 pounds of fuel.
The aircraft, an Airbus A350-900, began its final approach to runway 21R at LGAV Athens Eleftherios Venizelos International Airport from the north east, aligning with the runway heading of 217.0° at a distance of 4 nautical miles and an altitude of 1,342 feet above ground level. The approach quality was excellent, with a good threshold height and a threshold speed of 129 knots, well within the acceptable range. As the aircraft descended onto the runway, it touched down at a speed of 128 knots, slightly above the ideal touchdown speed, but still within safe limits.
The touchdown characteristics were generally good, with a touchdown rate of -177 feet per minute, indicating a controlled descent. The runway touchdown alignment was perfect, with the aircraft centered on the runway centerline. The local weather conditions, with a temperature of 57°F and a 5-knot headwind, contributed to a smooth and stable approach. The crosswind component was minimal, at 1 knot, further reducing the risk of deviation from the centerline.
The rollout phase was equally impressive, with the aircraft maintaining perfect centerline alignment as it slowed down and exited the runway. The total landing distance of 3,638 feet, which accounted for 35% of the runway length, was well within the acceptable range. Overall, the landing was scored at 99.8%, reflecting the high level of proficiency and control demonstrated by the crew throughout the approach, touchdown, and rollout phases.
Scroll or drag the slider to zoom · double-click to reset · hover for values