Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Departure
Use smoother, smaller aileron inputs to keep the wings level and hold bank angle near wings-level during the climb.
What happened: During the climb, bank angle rose to 2.9°, more roll than the climb out called for.
Watch for: Attitude indicator: wings level during the climb
Arrival
Track the centreline through touchdown using small rudder corrections against a point at the far end of the runway.
What happened: The aircraft touched down off the centreline at 321 m, and drifting off centreline at touchdown usually carries through into the rollout, as it did here with alignment reaching 285 m.
Watch for: Watch runway centreline position, keeping deviation inside the limit through touchdown and rollout.
Preparing for a stable approach will give you time to decide on whether to attempt the landing or going around. Too much altitude with a high sink rate will result in carrying too much speed onto the runway. Configuring flaps and the gear late also won't help the speed decay.
Read more in The Stabilised ApproachStart to finish · 21 stages, 20 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
Two stabilised approach gates, each with seven checks, where the approach path is 1,000 ft and 500 ft above the runway. They are the approach's score: the checks passed out of the checks that ran.
At the 1,000 ft gate: no landing flap set and centreline 6.7° off, against a 1° limit.
At the 500 ft gate: centreline 8.9° off, against a 1° limit.
The approach, gate by gate
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 2,557 m runway, to the same scale as the side view.
The 321 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Departing from Heydar Aliyev International Airport (UBBB) in Baku, Azerbaijan, the SR22 aircraft began its journey on runway 17, utilizing 78% of the 2,570-meter runway to achieve liftoff at a speed of 77 kt. The local weather conditions at the time of departure featured a temperature of 15 °C, with a moderate wind of 16 kt blowing from 320 °, resulting in a 10 kt crosswind and a 12 kt tailwind.
As the aircraft transitioned into the enroute phase, it began a series of climbs and level cruises, navigating through the Baku City and Absheron Rayon regions. Notably, the aircraft climbed from 492 ft asl to 2,510 ft asl in 3 minutes, covering 7 nm, and later from 2,502 ft asl to 6,011 ft asl in 3 minutes, covering 7 nm. The aircraft also engaged in several level cruises, including a 6-minute segment at 2,510 ft asl, covering 17 nm. The SR22 continued to climb, reaching an altitude of 14,011 ft asl, before beginning its descent towards Tbilisi International Airport (UGTB).
The final approach to runway 31L at UGTB was executed from the south east, with the aircraft maintaining a heading of 316.0 ° at 4 nm and 726 ft agl. The landing was successful, with a touchdown distance of 297 m and a touchdown speed of 72 kt. The touchdown rate was an impressive -74 fpm, and the runway touchdown alignment was very good. The total landing distance was 659 m, accounting for only 22% of the 2,998-meter runway. The aircraft's performance was further highlighted by its perfect runway rollout alignment. The SR22's total flight distance was 256 nm, covering the distance in 60 minutes and utilizing 79 kg of fuel.
The aircraft touched down on runway 31L at UGTB Tbilisi International Airport with a good threshold height, allowing for a smooth transition from the approach to the touchdown phase. The threshold speed of 79 kt was well within the acceptable range, indicating a well-executed approach. The aircraft maintained a steady descent rate, touching down at a speed of 72 kt, which was also within the desired parameters.
The touchdown characteristics were excellent, with a touchdown rate of -74 fpm, demonstrating a high degree of control and precision. The runway touchdown alignment was very good, with the aircraft centered on the runway, indicating a high level of skill and attention to detail from the pilot. The local weather conditions, with a temperature of 16 °C and a headwind of 16 kt, presented a moderate challenge, but the pilot successfully managed the aircraft to achieve a good touchdown.
The rollout phase was equally impressive, with the aircraft maintaining perfect alignment on the centerline. The total landing distance of 659 m, which accounted for only 22% of the runway length, was a testament to the pilot's skill and control. The overall performance of the aircraft and the pilot was outstanding, with a final score of 97.9% reflecting the high level of proficiency and precision demonstrated throughout the landing.
Scroll or drag the slider to zoom · double-click to reset · hover for values