Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Improve the takeoff
See Departure Roll
The rudder input is a changing profile through the roll rather than one that is held. So the demand on your right foot starts large at power application, eases as speed builds and the rudder gains authority, then jumps again at rotation.
Read more in Improve Your Take-OffsStart to finish · 18 stages, 16 in the score
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate for a circuit: seven checks where the approach path is 300 ft above the runway. The 1,000 ft gate is an instrument-approach check and does not apply. These checks are the approach's score.
The approach, gate by gate
Side view — the last 1,101 m of the approach.
Plan view — the full 1,101 m runway, to the same scale as the side view.
The 280 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Departing from the LFBR Aérodrome de Muret - Lherm, the Cessna C172 began its taxiing process from the parking area to the runway, a journey that took approximately 5 minutes and covered less than 1 nautical mile. With the local weather conditions indicating a temperature of 16 °C and a gentle headwind of 2 kt from a direction of 296 °, the aircraft was cleared for departure roll on runway 30. The takeoff distance of 426 meters, which accounted for 39% of the runway length, was achieved at a liftoff speed of 66 kt.
Following a successful takeoff, the aircraft entered a left-hand pattern, navigating the various phases of the circuit with ease. The left-hand pattern entry from runway 30 was completed in less than 1 nautical mile in 13 seconds, while the crosswind leg was covered in 24 seconds. The downwind turn, base leg turn, and final turn were all executed with precision, with the aircraft maintaining a steady heading and altitude. The final approach to runway 30 from the south-east, at a heading of 293.0 ° and an altitude of 340 feet above ground level, was characterized by a good threshold height and a threshold speed of 62 kt.
The landing on runway 30 was equally impressive, with a touchdown distance of 279 meters, which accounted for 53% of the runway length. The touchdown speed of 55 kt was good, and the touchdown rate of -70 fpm was excellent. The runway touchdown alignment was very good, and the runway rollout alignment was equally impressive. Following a successful landing, the aircraft taxied to the parking area, a journey that took less than 1 minute and covered less than 1 nautical mile. The total flight distance of 8 nautical miles was achieved in 10 minutes, with the aircraft using 2 kg of fuel.
The final approach to runway 30 at LFBR Aérodrome de Muret - Lherm was executed from the south east, heading 293.0° at 1 nm and 340 ft above ground level. The approach quality was excellent, with a good threshold height and a threshold speed of 62 kt, well within the acceptable range. The aircraft maintained a steady descent, touching down at a speed of 55 kt, which was also within the desired parameters.
The touchdown characteristics were impressive, with a touchdown distance of 279 m and a touchdown rate of -70 fpm, indicating a smooth and controlled landing. The runway touchdown alignment was very good, with the aircraft centered on the runway. The local weather conditions, with a temperature of 15 °C and a gentle headwind of 2 kt, contributed to a stable and predictable approach.
The rollout phase was equally impressive, with the aircraft maintaining a very good alignment on the runway centerline. The total landing distance of 582 m, which accounted for 53% of the runway length, was well within the acceptable range. Overall, the landing was scored 99.9%, reflecting the high level of proficiency and control demonstrated by the pilot throughout the approach, touchdown, and rollout phases.
Scroll or drag the slider to zoom · double-click to reset · hover for values