Flight Score
Get the gear down before the gate
Next time
Track the centreline through touchdown using small rudder corrections against a point at the far end of the runway.
What happened: The aircraft touched down off the centreline at 33 m, and drifting off centreline at touchdown usually carries through into the rollout, as it did here with alignment reaching 93 m.
Watch for: Watch runway centreline position, keeping deviation inside the limit through touchdown and rollout.
Departure
Raise the gear promptly once a positive rate is confirmed, before reaching the gate altitude.
What happened: Gear retraction was late relative to the target height for this stage of the climb.
Preparing for a stable approach will give you time to decide on whether to attempt the landing or going around. Too much altitude with a high sink rate will result in carrying too much speed onto the runway. Configuring flaps and the gear late also won't help the speed decay.
Read more in The Stabilised ApproachStart to finish · 13 stages, 12 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: seven checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out. These checks are the approach's score.
At the 500 ft gate: gear still up, sink rate 1,669 fpm, more than the glideslope needed, centreline 6.2° off, against a 1° limit, wings 11° of bank, against a 10° limit and speed 82 kt FAST on the reference speed of 112 kt.
The approach, gate by gate
Side view — the last 1,524 m of the approach.
Plan view — the full 1,524 m runway, to the same scale as the side view.
Touched down 547 m past the threshold — beyond the full-score zone. The arrival was smooth.
The rest of the report
The Pilatus PC-24 (N971LY) taxied to runway 28 at Block Island State Airport (KBID) and commenced the departure roll, using 427 m of runway which represented 57 % of the available length. The aircraft lifted off at 111 kt under a temperature of 26 °C, with a wind from 309° at 10 kt, a 7 kt headwind component and a 7 kt cross-wind component.
Climb began approximately one mile west of New Shoreham, Rhode Island, with the airplane accelerating from 1,150 ft asl to 2,724 ft asl. In one minute the aircraft gained 1,574 ft while covering 4 nm.
Level cruise was established five miles west of KBID and continued for three minutes, during which the flight covered 13 nm at a steady altitude.
The final approach to Montauk, New York, was flown from one nautical mile out at 450 ft agl, with the aircraft maintaining the approach path to the runway threshold.
Descent from the final approach segment reduced altitude from 54 ft agl to ground level in eight seconds, a vertical change of 54 ft.
Touchdown occurred over Montauk at a speed of 114 kt, with a vertical speed of minus 170 fpm. The aircraft contacted the ground 125 m beyond the designated touchdown zone.
Rollout continued on the runway for a distance of 862 m, after which the aircraft decelerated to a stop.
Taxi-in from the runway to the parking area took less than one minute and covered less than one nautical mile.
In total, the flight covered 19 nm, lasted 5 minutes, and consumed 61 kg of fuel.
The Pilatus PC-24 N971LY conducted the final approach to Montauk from 1 nm to 1 nm at 450 ft agl, with local temperature 26 °C, wind 10 kt from 309°, a 9 kt crosswind component and a 5 kt headwind component.
During the threshold and flare the aircraft descended from 54 ft agl to 0 ft agl, a decrease of 54 ft in 8 seconds.
Touchdown occurred at a speed of 114 kt and a vertical rate of minus 170 fpm; the touchdown point was 125 m beyond the touchdown zone.
The rollout continued at 0 ft asl and covered a distance of 862 m.
To improve the score of 62.6 %, focus on achieving the designated touchdown zone by refining the flare timing and aiming point, which will reduce the 125 m overshoot observed. Adjusting the approach path to place the aircraft closer to the zone will also help align the rollout distance with expectations.
Scroll or drag the slider to zoom · double-click to reset · hover for values