Flight Score
Landing lights
Before entering the runway, make sure your landing lights are on and the taxi lights switched off.
Start to finish · 20 stages, 19 scored
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: five checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out.
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 3,701 m runway, to the same scale as the side view.
The 418 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Overall, this aircraft landing had a mix of strengths and weaknesses in various phases.
During the Approach Phase, the descent path was below the glideslope limit, indicating that the aircraft was descending too steeply towards the runway. This could have been due to a variety of factors such as incorrect approach speed or altitude management. However, the heading alignment and speed were on target, demonstrating good control in those areas.
Moving on to the Landing Phase, the threshold height was slightly too low, indicating that the aircraft may have been descending too rapidly just before touchdown. Additionally, there was a poor landing flare, which suggests that the pilot did not smoothly transition the aircraft from descent to landing. A proper landing flare is important for ensuring a smooth touchdown.
In the Touchdown Phase, the touchdown rate was smooth and the speed was on target, suggesting that the pilot was able to control the aircraft well during this critical phase. The touchdown distance inside the touchdown zone was within safe parameters, but the runway touchdown position was slightly off center, 4.4 meters from the centerline. This could have been caused by a slight misalignment during the approach or landing.
Finally, in the Rollout Phase, the runway alignment was 8.0 meters from the centerline, indicating that the aircraft might have drifted slightly to one side during the rollout. Proper alignment is important for ensuring safe taxiing and landing operations.
In conclusion, while this aircraft landing had some areas of weakness such as poor descent path and landing flare, there were also strengths such as smooth touchdown rate and on-target speed. Continuous practice and attention to detail in all phases of the landing process can help improve overall landing performance.