Departure
Level the wings with coordinated aileron to hold bank angle near zero during the initial climb, starting from 3.7°.
What happened: Bank angle was elevated during the initial climb and excess bank usually persists into the second climb segment.
Watch for: Attitude indicator, wings level with bank angle near zero degrees.
Ground control varies with speed, full authority at walking pace, progressively reducing as groundspeed rises. The aircraft becomes twitchy at any speed, every small pedal input swings the nose, which can encourage large-amplitude leg inputs that no real aircraft would accept.
Read more in How to Taxi AnywhereStart to finish · 19 stages, 17 scored
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
Two stabilised approach gates, each with six checks, where the approach path is 1,000 ft and 500 ft above the runway.
The approach, gate by gate
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 1,891 m runway, to the same scale as the side view.
The 437 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
The flight began with a taxiing period from the parking to the runway, which took 3 minutes and covered less than 1 nautical mile. The aircraft then departed from runway 34 at Zürich Airport (LSZH), with a takeoff distance of 626 meters, which accounted for 19% of the runway. The liftoff speed was 124 knots.
The local weather conditions at the time of departure were characterized by a temperature of 3°C, with a wind speed of 5 knots at 40°. The crosswind component was 4 knots, while the headwind component was 2 knots. The aircraft then began its enroute climb, starting overhead Oberglatt in the Kanton Zurich, Switzerland. The climb took 8 minutes, during which the aircraft ascended from 2,398 feet above sea level to 19,711 feet above sea level, covering a distance of 33 nautical miles.
Following the enroute climb, the aircraft entered a level cruise phase, starting overhead Sankt Gallen in the Kanton St. Gallen, Switzerland. This phase lasted for 3 minutes and covered a distance of 21 nautical miles. The aircraft then began its enroute descent, starting overhead Lingenau in Vorarlberg, Austria. The descent took 2 minutes, during which the aircraft descended from 19,724 feet above sea level to 14,045 feet above sea level, covering a distance of 10 nautical miles.
The aircraft then entered another level cruise phase, starting 3 miles west of Obermaiselstein in Bavaria, Germany. This phase lasted for 3 minutes and covered a distance of 10 nautical miles. The aircraft then began its final descent, starting 3 miles north of Holzgau in Tirol, Austria. The descent took 10 minutes, during which the aircraft descended from 13,702 feet above sea level to 2,956 feet above sea level, covering a distance of 39 nautical miles.
The final approach to runway 08 at Innsbruck Airport (LOWI) was made from the west, with a heading of 81.0° at 3 nautical miles and 1,042 feet above ground level. The landing was made on runway 08, which had a length of 1,891 meters. The threshold height was good, and the threshold speed was slightly above the target speed at 128 knots.
The touchdown distance was good at 437 meters, and the touchdown speed was 123 knots, which was slightly fast. The touchdown rate was good at -175 feet per minute. The runway touchdown alignment was very good. The local weather conditions at the time of landing were characterized by a temperature of 1°C, with a wind speed of 10 knots at 270°. The crosswind component was 2 knots, while the tailwind component was 10 knots.
The total landing distance was 1,395 meters, which accounted for 74% of the runway. The runway rollout alignment was very good. The taxiing period from the runway to the parking took 1 minute and covered less than 1 nautical mile. The total flight distance was 117 nautical miles, and the flight took 30 minutes. The aircraft used 447 kilograms of fuel during the flight.
Aircraft C750 successfully landed at Innsbruck Airport (LOWI) with a score of 98.1%. The final approach was conducted from the west, heading 81.0° at a distance of 3 nautical miles and an altitude of 1,042 feet above ground level (agl). The aircraft touched down on runway 08, which has a length of 1,891 meters.
The threshold height was reported as good, indicating that the aircraft was at the correct height as it approached the runway threshold. However, the threshold speed was slightly above the target speed of 128 kt, suggesting that the pilot may have been slightly aggressive in their approach. Despite this, the touchdown distance was good at 437 meters, indicating that the pilot had sufficient control over the aircraft during the landing.
The touchdown speed of 123 kt was reported as fast, which may indicate that the pilot could have used a more gradual descent to reduce the touchdown speed. Nevertheless, the touchdown rate of -175 feet per minute (fpm) was good, indicating that the aircraft was able to touch down smoothly and without excessive deceleration.
The runway touchdown alignment was very good, suggesting that the pilot had excellent control over the aircraft during the final stages of the approach. The local weather conditions at the time of the landing were characterized by a temperature of 1°C and a wind speed of 10 kt from 270°. This resulted in a crosswind of 2 kt and a tailwind of 10 kt, which may have affected the aircraft's performance during the landing.
The total landing distance was 1,395 meters, which is 74% of the runway length. This is a relatively short landing distance, indicating that the pilot had good control over the aircraft during the landing. The runway rollout alignment was also very good, suggesting that the pilot was able to maintain control of the aircraft during the rollout phase of the landing.
Overall, the landing was successful, and the pilot demonstrated good control over the aircraft during the final stages of the approach and the landing. However, there may be opportunities for improvement in terms of reducing the touchdown speed and maintaining a more gradual descent.