Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Departure
Apply small rudder corrections against a point at the far end of the runway to hold the centreline during the roll.
What happened: The aircraft tracked 10 m off the runway centreline during the ground roll, and flights with this pattern usually carry extra bank, around 3.3°, into the first climb.
Watch for: Heading indicator: wings level, tracking the runway centreline
A small uncorrected heading error at 40 knots becomes a metre of offset per second by 100 knots, noticed only at rotation, producing a crabbed liftoff. Root cause is nearly always eyes on the tape instead of the far end of the runway. Small heading changes displace a distant point visibly long before the nearby centreline stripes look wrong.
Read more in Improve Your Take-OffsStart to finish · 26 stages, 24 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
Two stabilised approach gates, each with seven checks, where the approach path is 1,000 ft and 500 ft above the runway.
The approach, gate by gate
Side view — the last 1,868 m of the approach.
Plan view — the first 1,868 m of the 3,344 m runway, to the same scale as the side view.
The 499 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
The flight began with the Boeing 777F taxiing from the parking area to the runway at MMMX Benito Juárez International Airport, taking 11 minutes and covering a distance of 2 nautical miles. The aircraft then departed from runway 05L, with a takeoff distance of 2,311 meters, which was 78% of the runway length. The liftoff speed was 174 knots, and the local weather conditions were characterized by a temperature of 28°C, with a wind speed of 16 knots at 350°.
As the aircraft climbed out of the airport, it began its enroute climb, starting 2 miles northeast of MMMX Benito Juárez International Airport. The climb took 17 minutes, during which the aircraft ascended from 8,359 feet above sea level to 34,070 feet above sea level, an increase of 25,711 feet. The enroute climb covered a distance of 115 nautical miles.
The aircraft then entered its enroute level cruise, starting 1 mile north of Pompeya, Mexico. This phase of the flight lasted 133 minutes, during which the aircraft covered a distance of 1,065 nautical miles. The aircraft then began another enroute climb, this time starting 8 miles northwest of Odum, Georgia, United States. The climb took 3 minutes, during which the aircraft ascended from 34,241 feet above sea level to 36,286 feet above sea level, an increase of 2,045 feet.
The aircraft then entered its enroute level cruise again, starting overhead Claxton, Georgia, United States. This phase of the flight lasted 198 minutes, during which the aircraft covered a distance of 1,696 nautical miles. The aircraft then began another enroute climb, starting at a location with a latitude of 44.3343876 and a longitude of -49.0590763. The climb took 3 minutes, during which the aircraft ascended from 34,766 feet above sea level to 36,718 feet above sea level, an increase of 1,952 feet.
The aircraft then entered its enroute level cruise once more, starting at a location with a latitude of 44.5697346 and a longitude of -48.3768676. This phase of the flight lasted 227 minutes, during which the aircraft covered a distance of 1,953 nautical miles. The aircraft then began its enroute descent, starting 1 mile west of Berjou, Normandie, France. The descent took 9 minutes, during which the aircraft descended from 38,090 feet above sea level to 14,171 feet above sea level, a decrease of 23,919 feet.
The aircraft then entered its enroute level cruise once more, starting 1 mile southeast of Noce, Normandie, France. This phase of the flight lasted 7 minutes, during which the aircraft covered a distance of 32 nautical miles. The aircraft then began another enroute descent, starting overhead Jallans, Centre-Val de Loire, France. The descent took 3 minutes, during which the aircraft descended from 13,659 feet above sea level to 10,598 feet above sea level, a decrease of 3,060 feet.
The aircraft then entered its enroute level cruise once more, starting overhead Voves, Centre-Val de Loire, France. This phase of the flight lasted 2 minutes, during which the aircraft covered a distance of 7 nautical miles. The aircraft then began another enroute descent, starting overhead Voise, Centre-Val de Loire, France. The descent took 8 minutes, during which the aircraft descended from 10,530 feet above sea level to 1,582 feet above sea level, a decrease of 8,948 feet.
The final approach to runway 06
The Boeing 777F aircraft successfully landed at LFPO Paris-Orly Airport, achieving a high score of 99.0%. The final approach to runway 06 was conducted from the southwest, with a heading of 62.0° at a distance of 4 nautical miles and an altitude of 1,287 feet above ground level (agl). The aircraft's approach was characterized by a good threshold height, indicating that the pilots maintained a safe and controlled descent.
Upon touchdown, the aircraft's threshold speed was recorded at 142 knots, which is within the acceptable range for a safe landing. The touchdown point was located 90 meters beyond the designated touchdown zone, but this deviation was not significant enough to impact the overall performance of the landing. The touchdown speed of 135 knots was also within the acceptable range, and the touchdown rate of -197 feet per minute (fpm) was good, indicating a controlled and smooth touchdown.
The local weather conditions at the time of the landing were favorable, with a temperature of 22°C and a gentle wind of 5 knots at 10°. The crosswind component was 4 knots, while the headwind component was 3 knots, which did not pose any significant challenges to the pilots. The total landing distance of 1,794 meters was 54% of the runway length, indicating that the aircraft was able to stop safely within the available runway length.
The runway rollout alignment was also very good, indicating that the pilots maintained control of the aircraft during the rollout phase and were able to bring the aircraft to a safe stop. Overall, the landing was characterized by good performance and control, with the aircraft touching down safely and coming to a stop within the designated runway area.
Scroll or drag the slider to zoom · double-click to reset · hover for values