Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Settle the descent rate
Preparing for a stable approach will give you time to decide on whether to attempt the landing or going around. Too much altitude with a high sink rate will result in carrying too much speed onto the runway. Configuring flaps and the gear late also won't help the speed decay.
Read more in The Stabilised ApproachStart to finish · 13 stages, 11 scored
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: seven checks where the approach path is 300 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out. These checks are the approach's score.
At the 300 ft gate: sink rate 1,334 fpm, more than the glideslope needed and wings 10° of bank, against a 10° limit.
The approach, gate by gate
Side view — the last 1,101 m of the approach.
Plan view — the full 1,101 m runway, to the same scale as the side view.
The 150 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
The flight departed from LFBR Aérodrome de Muret - Lherm, taxiing from the parking area to the runway took less than a minute, covering a short distance of less than 1 nautical mile. The departure roll commenced on runway 30, with a takeoff distance of 717 meters, accounting for 65% of the runway length. The aircraft lifted off at a speed of 103 knots, amidst local weather conditions of 16°C temperature and a gentle headwind of 1 knot from 270 degrees.
As the aircraft transitioned to the enroute phase, it began climbing from 1,480 feet above sea level to 2,100 feet, an increase of 621 feet in just 1 minute, while covering a distance of 3 nautical miles. The climb was initiated overhead Labastidette, in the Occitanie region of France. Subsequently, the aircraft commenced its descent 1 mile east of Lamasquere, reducing its altitude from 2,096 feet to 807 feet, a decrease of 1,289 feet in 3 minutes, covering a distance of 6 nautical miles. The final approach to runway 30 at LFBR Aérodrome de Muret - Lherm was conducted from the southeast, with a heading of 297.0 degrees at an altitude of 158 feet above ground level.
The landing was executed smoothly, with a threshold speed slightly below the target at 84 knots. The touchdown distance was 148 meters, and the touchdown speed was 78 knots, both of which were considered good. The touchdown rate was also smooth at -119 feet per minute. The runway touchdown alignment was perfect, and the runway rollout alignment was equally impressive. Following the landing, the aircraft taxied to the parking area, taking 6 minutes to cover a distance of less than 1 nautical mile. The total flight distance was 12 nautical miles, with a total flight time of 12 minutes, and the aircraft consumed 7 kilograms of fuel.
The final approach to runway 30 at LFBR Aérodrome de Muret - Lherm was executed from the south east, with the aircraft maintaining a heading of 297.0° at 0 nm and 158 ft above ground level. The approach quality was excellent, with a good threshold height and a threshold speed that was slightly below the target at 84 kt. The aircraft touched down smoothly at a speed of 78 kt, with a touchdown rate of -119 fpm, indicating a well-controlled descent.
The touchdown characteristics were good, with a touchdown distance of 148 m. The aircraft maintained perfect runway touchdown alignment, and the centreline alignment was also spot on during the rollout phase. The local weather conditions were favourable, with a temperature of 16 °C and a wind of 1 kt at 270°, resulting in a negligible crosswind and a slight headwind of 1 kt. The total landing distance was 639 m, which is 58% of the runway length, indicating a safe and efficient landing.
The rollout phase was executed flawlessly, with the aircraft maintaining perfect runway alignment. The overall performance of the landing was exceptional, with a score of 99.2%. The pilot's skill and attention to detail were evident throughout the approach, touchdown, and rollout phases, resulting in a smooth and controlled landing.
Scroll or drag the slider to zoom · double-click to reset · hover for values