Speed on the fast side
Speed at this height is usually bought with gradient. It's rarely dangerous and it's often just an early acceleration, but with flaps still out you may be heading towards the flap limit and a flat fast climb puts you at the acceleration altitude with the cleaning-up still to do.
Read more in Improve Your Take-OffsStart to finish · 15 stages, 13 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
Two stabilised approach gates, each with seven checks, where the approach path is 1,000 ft and 500 ft above the runway. They are the approach's score: the checks passed out of the checks that ran.
The approach, gate by gate
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 3,192 m runway, to the same scale as the side view.
Touched down 524 m past the threshold — beyond the full-score zone. The arrival was smooth.
The rest of the report
The TBM 930 taxied from the parking area to runway 11 at SMJP Johan Adolf Pengel International Airport in 3 minutes, covering less than 1 nm.
Takeoff roll on runway 11 was 812 m, representing 23 % of the runway, and the aircraft lifted off at 106 kt. Local weather reported a temperature of 28 °C, wind 4 kt from 65°, with a 2 kt cross-wind component and a 4 kt head-wind.
Climb commenced 3 miles east of SMJP, ascending from 1,076 ft asl to 3,498 ft asl, a gain of 2,422 ft achieved in 3 minutes while covering 13 nm.
Level cruise began 16 miles east of SMJP and continued for 33 minutes, during which 138 nm were flown.
Descent started 20 miles west of SOCA Cayenne - Félix Ebéoué Airport, descending from 3,496 ft asl to 1,274 ft asl, a loss of 2,222 ft in 5 minutes over 17 nm.
Final approach to runway 08 at SOCA was executed from 1,290 ft agl down to 42 ft agl in 134 seconds, and the aircraft scored on the stabilisation gates.
Landing on runway 08, which is 3,192 m long, occurred with a threshold speed of 94 kt, well above the target. Touchdown was recorded 91 m beyond the touchdown zone at a speed of 79 kt, with a smooth vertical rate of minus 128 fpm, and the touchdown point was offset 12.1 m from the centreline. Weather at the time was 27 °C, wind 2 kt from 90°, with a 1 kt cross-wind and 1 kt head-wind. Total landing distance measured 917 m, representing 29 % of the runway.
Runway rollout alignment was slightly off centreline by 10.8 m.
The aircraft taxied from the runway to the parking area in 1 minute, covering less than 1 nm.
Overall, the flight covered 177 nm in 50 minutes and consumed 171 kg of fuel.
The TBM 930 achieved a score of 92.9 % and on final approach to runway 08 at SOCA Cayenne - Félix Eboué Airport the approach was assessed as stabilised at the 1,000 ft gate, with gear, flaps, sink rate, glideslope, centreline and speed all within limits. The aircraft descended from 1,290 ft agl to 42 ft agl in 134 seconds and earned points on the stabilisation gates.
During the threshold and flare phase the runway length was 3,192 m and the threshold height was reported as good. Threshold speed was well above target at 94 kt, and the aircraft crossed the threshold 91 m beyond the touchdown zone. Touchdown speed was 79 kt and the touchdown rate was smooth at minus 128 fpm, although the runway touchdown position was misaligned by 12.1 m from the centreline.
At touchdown the aircraft touched down 91 m beyond the designated zone with a speed of 79 kt and a vertical rate of minus 128 fpm. Lateral alignment was off by 12.1 m from the centreline, while speed and rate remained within acceptable limits.
Rollout covered a total landing distance of 917 m, representing 29 % of the runway, and the rollout alignment was slightly misaligned by 10.8 m from the centreline. Local weather was 27 °C with wind 2 kt from 090°, a crosswind component of 1 kt and a headwind component of 1 kt.
To improve future performance, focus on reducing the lateral deviation at touchdown and maintaining centreline alignment through the rollout, as the 12.1 m and 10.8 m offsets represent the largest variances despite an overall strong score.