Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Hold the approach angle
Preparing for a stable approach will give you time to decide on whether to attempt the landing or going around. Too much altitude with a high sink rate will result in carrying too much speed onto the runway. Configuring flaps and the gear late also won't help the speed decay.
Read more in The Stabilised ApproachStart to finish · 21 stages, 20 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: five checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out.
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 2,653 m runway, to the same scale as the side view.
The 447 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
This analysis reflects a successful aircraft landing with a score of 95.1%. Despite some areas for improvement, overall, the landing was executed with skill and precision.
Starting with the Approach Phase, unstable glideslope alignment and a higher-than-target speed are areas that could be refined for next time. Ensuring a smooth and consistent descent path along the glideslope will improve alignment and help achieve the desired speed at touchdown.
Moving on to the Landing Phase, it is commendable that the threshold height was well-maintained and the landing flare was executed effectively. However, the poor bank angle stability during landing indicates a need for better control and coordination during this critical phase. Focus on maintaining a stabilized approach angle and minimizing unnecessary adjustments to improve overall stability.
In the Touchdown Phase, excellent touchdown rate and accuracy in touchdown position are positive indicators of skill and precision. Although speed was slightly above target, the fact that the touchdown occurred within the designated zone demonstrates good judgment and control.
Lastly, in the Rollout Phase, the runway alignment being slightly off centerline by 3.8 meters is a minor deviation that can be easily corrected with increased attention to aligning the aircraft with the runway centerline during the rollout.
Overall, this landing showcases a high level of proficiency and attention to detail. By addressing the areas of improvement identified in the analysis, future landings can further enhance performance and safety. Keep up the good work and continue striving for excellence in every aspect of aircraft operations. Well done!
Scroll or drag the slider to zoom · double-click to reset · hover for values