Hold the cruise
Enroute Level scored 93.50 % — bank angle up to 48.1 ° at 84 % was the weak point. Fixed, this flight scores 96.46 %.
Start to finish · 8 stages, 8 scored
Events
Events
Events
Two stabilised approach gates, each with six checks at 1,000 ft and 500 ft above the runway.
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 2,489 m runway, to the same scale as the side view.
The 294 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
The flight began with a departure roll from runway 13 at UGSB Batumi International Airport, where the DA-50 aircraft took off with a takeoff distance of 310 meters, which accounted for 12% of the runway. The liftoff speed was 72 knots, and the aircraft quickly gained altitude. At the time of takeoff, the local weather conditions were characterized by a temperature of 20 degrees Celsius and a wind speed of 10 knots from a direction of 170 degrees. This resulted in a crosswind of 6 knots and a headwind of 8 knots.
After departing the airport, the aircraft entered a level cruise phase, where it flew overhead UGSB Batumi International Airport for 2 minutes, covering a distance of 2 nautical miles. This brief cruise phase allowed the aircraft to reach a steady altitude before beginning its descent for landing.
The final approach to runway 13 was initiated from a heading of 130 degrees, approximately 1 nautical mile from the airport, and at an altitude of 168 feet above ground level. The aircraft maintained a steady descent until it touched down on the runway, where it landed with a touchdown speed of 71 knots and a smooth touchdown rate of -110 feet per minute. The touchdown distance was 292 meters, which was a good result considering the runway length of 2,489 meters.
However, the runway touchdown position was slightly misaligned from the centerline, by 8.2 meters. The local weather conditions remained the same as during takeoff, with a temperature of 20 degrees Celsius and a wind speed of 10 knots from a direction of 170 degrees. This resulted in a crosswind of 6 knots and a headwind of 8 knots.
Following the landing, the aircraft underwent a rollout phase, where it gradually slowed down and came to a stop. Although the runway rollout alignment was slightly misaligned from the centerline, by 7.7 meters, the overall landing distance of 447 meters, which accounted for 18% of the runway, was considered good.
In conclusion, the flight was a successful one, with the DA-50 aircraft performing well in terms of takeoff, cruise, and landing. The total flight distance was 3 nautical miles, and the aircraft used 2 kilograms of fuel during the flight.
The DA-50 aircraft successfully landed at UGSB Batumi International Airport, achieving a score of 95.5%. The final approach was conducted from the north-west, heading 130.0° at 1 nautical mile and 168 feet above ground level (agl). The aircraft touched down on runway 13, which has a length of 2,489 meters.
The threshold height was satisfactory, and the threshold speed was maintained at 79 knots, indicating a well-executed approach. The touchdown distance of 292 meters was also within acceptable limits. The touchdown speed of 71 knots was good, and the touchdown rate of -110 feet per minute (fpm) was smooth, suggesting a controlled descent.
However, there were some minor deviations from the ideal landing. The runway touchdown position was misaligned by 8.2 meters from the centreline, which may have been due to slight variations in wind or pilot control. The local weather conditions, with a temperature of 20°C and wind at 10 knots from 170°, resulted in a crosswind of 6 knots and a headwind of 8 knots.
The total landing distance of 447 meters was 18% of the runway length, which is within acceptable limits. Nevertheless, the runway rollout alignment was slightly misaligned by 7.7 meters from the centreline, indicating a minor deviation from the ideal path. Overall, the landing was successful, and the pilot demonstrated good control and adherence to standard procedures.
Scroll or drag the slider to zoom · double-click to reset · hover for values