Maintain the centreline
A small uncorrected heading error at 40 knots becomes a metre of offset per second by 100 knots, noticed only at rotation, producing a crabbed liftoff. Root cause is nearly always eyes on the tape instead of the far end of the runway. Small heading changes displace a distant point visibly long before the nearby centreline stripes look wrong.
Read more in Improve Your Take-OffsStart to finish · 20 stages, 18 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Two stabilised approach gates, each with five checks, where the approach path is 1,000 ft and 500 ft above the runway.
The approach, gate by gate
Side view — the last 1,693 m of the approach.
Plan view — the first 1,693 m of the 2,146 m runway, to the same scale as the side view.
The 105 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Departing from Girona-Costa Brava Airport, the Airbus A320 began its journey by taxiing from the parking area to the runway, a process that took 5 minutes and covered a distance of 1 nautical mile. With the local weather conditions at 10°C and a gentle headwind of 2 kt, the aircraft took off from runway 01, accelerating to a liftoff speed of 141 kt after a takeoff distance of 1,103 m, which was 49% of the runway length.
As the aircraft climbed to its enroute level, it began its ascent from 1,474 ft above sea level to 32,927 ft, a vertical increase of 31,453 ft in just 15 minutes, covering a distance of 95 nautical miles. The climb phase was followed by a 44-minute cruise at a steady altitude, during which the aircraft covered 332 nautical miles. The descent phase began 2 miles east of Torre, Switzerland, where the aircraft descended from 32,823 ft to 6,051 ft in 13 minutes, covering 88 nautical miles. The aircraft then entered a series of short level cruises, each lasting only a few minutes, before beginning its final descent to Friedrichshafen Airport.
The final approach to runway 24 at EDNY Friedrichshafen Airport was initiated from the north-east, with the aircraft heading 240.0° at 4 nautical miles and 1,363 ft above ground level. The landing was successful, with a touchdown distance of 105 m and a touchdown speed of 123 kt. However, the touchdown rate was slightly higher than expected at -557 fpm, and the runway touchdown position was slightly misaligned from the centreline. The total landing distance was 1,575 m, which was 84% of the runway length. After taxiing to the parking area, the aircraft had completed a total flight distance of 548 nautical miles, using 3,721 kg of fuel and taking a total of 91 minutes.
The aircraft touched down on runway 24 at EDNY Friedrichshafen Airport with a good threshold height, allowing the crew to maintain a stable approach profile. The threshold speed was also well-managed, with a speed of 124 kt at the moment of touchdown. The touchdown distance of 105 m was within acceptable limits, indicating a well-executed flare. However, the touchdown speed of 123 kt was slightly above the optimal range, and the touchdown rate of -557 fpm was very hard, suggesting a slightly aggressive approach.
The aircraft's alignment with the runway centreline was not perfect, with a slight deviation of 6.3 m at touchdown. This misalignment was also evident during the rollout phase, where the aircraft was 8.8 m off-centreline. Despite these deviations, the crew maintained control of the aircraft throughout the landing, and the total landing distance of 1,575 m was within 84% of the available runway length.
The local weather conditions, with a temperature of 3 °C and a light wind of 5 kt at 70 °, did not pose significant challenges to the landing. The crosswind component was minimal, at 1 kt, while the tailwind component was 5 kt. Overall, the landing was considered satisfactory, with a score of 88.8%. While there were some areas for improvement, the crew demonstrated good control and management of the aircraft throughout the approach, touchdown, and rollout phases.