Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Improve the rollout
Ground control varies with speed, full authority at walking pace, progressively reducing as groundspeed rises. The aircraft becomes twitchy at any speed, every small pedal input swings the nose, which can encourage large-amplitude leg inputs that no real aircraft would accept.
Read more in How to Taxi AnywhereStart to finish · 20 stages, 18 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Two stabilised approach gates, each with five checks, where the approach path is 1,000 ft and 500 ft above the runway.
The approach, gate by gate
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 3,480 m runway, to the same scale as the side view.
The 334 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Departing from Brussels Airport, the Embraer E190 began its journey by taxiing from the parking area to the runway, a process that took 5 minutes and covered a distance of 1 nautical mile. As it reached the runway, the aircraft accelerated down runway 25R, lifting off at a speed of 151 knots after a takeoff distance of 1,480 meters, which equated to 48% of the runway's length. The local weather conditions at the time of departure featured a temperature of 15°C, with a 10-knot headwind and a crosswind of just 1 knot.
As the aircraft climbed to its cruising altitude, it passed overhead Diegem, Flanders, Belgium, and continued to ascend to 39,036 feet above sea level, a gain of 37,875 feet in just 15 minutes. The enroute climb phase was followed by a level cruise, which started 1 mile west of Vegelinsoord, Provincie Friesland, The Netherlands, and lasted for 25 minutes, covering a distance of 673 nautical miles. The aircraft then began its descent, initially from 39,012 feet above sea level to 3,554 feet above sea level, a decrease of 35,458 feet in 11 minutes, before making a brief level cruise 3 miles south of Pornainen, Uusimaa, Finland. The final descent phase started 3 miles north-east of Kerava, Uusimaa, Finland, and brought the aircraft down to 1,299 feet above sea level in just 2 minutes.
The Embraer E190 touched down on runway 22L at Helsinki Vantaa Airport, Finland, after a total flight distance of 960 nautical miles, which was completed in 66 minutes and required 4,213 kilograms of fuel. The landing was characterized by a slightly fast touchdown speed of 118 knots and a fair touchdown rate of -243 feet per minute. The total landing distance was 1,230 meters, which equated to 39% of the runway's length. After landing, the aircraft taxied to the parking area, a process that took just 1 minute and covered a distance of less than 1 nautical mile.
The Embraer E190 touched down on runway 22L at EFHK Helsinki Vantaa Airport with a score of 97.3%. The aircraft approached the runway from the north east, heading 228.0° at 4 nautical miles and 1,143 feet above ground level. The final approach was characterized by good quality, with a threshold height that was well within acceptable limits. However, the threshold speed was slightly above the target, reaching 124 knots.
The touchdown was notable for its distance, which was good at 341 meters. The touchdown speed of 118 knots was a little fast, but the touchdown rate of -243 feet per minute was fair. The runway touchdown alignment was perfect, with the aircraft centered on the runway. The local weather conditions, with a temperature of 11°C and a light wind of 3 knots at 300°, contributed to a smooth landing. The crosswind was minimal at 3 knots, and the headwind was 1 knot, which helped to stabilize the aircraft during the approach.
The rollout phase was slightly marred by a misalignment of 7.9 meters from the centreline. However, the total landing distance of 1,230 meters, which accounted for 39% of the runway length, was well within acceptable limits. Overall, the landing was a success, with the aircraft demonstrating good control and stability throughout the approach, touchdown, and rollout phases.
Scroll or drag the slider to zoom · double-click to reset · hover for values