Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Improve the rollout
Ground control varies with speed, full authority at walking pace, progressively reducing as groundspeed rises. The aircraft becomes twitchy at any speed, every small pedal input swings the nose, which can encourage large-amplitude leg inputs that no real aircraft would accept.
Read more in How to Taxi AnywhereStart to finish · 21 stages, 19 scored
Events
Events
Events
Events
Events
Events
Events
Events
Two stabilised approach gates, each with six checks at 1,000 ft and 500 ft above the runway.
The approach, gate by gate
Side view — the last 1,732 m of the approach.
Plan view — the first 1,732 m of the 2,486 m runway, to the same scale as the side view.
Touched down 826 m past the threshold — beyond the full-score zone. The arrival was smooth.
The rest of the report
The Boeing 777-300ER taxied from the parking area to runway 36L at LEMD Adolfo Suárez Madrid-Barajas Airport. The taxi-out took 9 minutes and covered less than 1 nm.
The aircraft commenced the departure roll on runway 36L. Takeoff was achieved after a distance of 1,873 m, representing 43 % of the runway. Liftoff speed was 160 kt. Local weather reported a temperature of 27 °C, wind 1 kt at 10 °, crosswind 0 kt and headwind 1 kt.
En-route climb began 2 miles north west of Paracuellos de Jarama (Comunidad de Madrid, Spain). The aircraft climbed from 2,922 ft asl to 38,011 ft asl, an increase of 35,090 ft in 16 minutes while covering 113 nm.
Level cruise started 5 miles north of Jarque (Aragon, Spain) and lasted 54 minutes, covering 476 nm.
Descent commenced 3 miles west of Rossiniere (Canton de Vaud, Switzerland). The aircraft descended from 37,461 ft asl to 36,624 ft asl, a decrease of 837 ft in 2 minutes over 13 nm.
A subsequent level cruise was flown overhead Jaun (Canton de Fribourg, Switzerland) for 2 minutes, covering 13 nm.
Descent resumed 1 mile west of Wattenwil (Canton de Berne, Switzerland). The aircraft descended from 36,132 ft asl to 5,051 ft asl, a decrease of 31,081 ft in 14 minutes, covering 100 nm.
Another level cruise was conducted overhead Thayngen, Bibern (Kanton Schaffhausen, Switzerland) for 8 minutes, covering 34 nm.
The final descent began overhead Rikon / Rikon (Dorfkern) (Kanton Zurich, Switzerland). The aircraft descended from 4,593 ft asl to 2,834 ft asl, a decrease of 1,760 ft in 2 minutes, covering 5 nm.
The final approach to runway 28 at LSZH Zürich Airport was flown from the east, on a heading of 276.0 ° at 4 nm and 1,418 ft agl.
Landing on runway 28, which is 2,486 m long, occurred with a threshold height at 67 ft agl above target and a threshold speed of 149 kt. Touchdown was recorded 392 m beyond the touchdown zone, at a speed of 148 kt, with a firm touchdown rate of minus 321 fpm. The touchdown point was offset 7.6 m from the centreline. Local weather at the time was
The Boeing 777-300ER established the final approach to runway 28 at LSZH Zürich Airport from the east on a heading of 276.0 ° at 4 nm and 1,418 ft agl. The approach was assessed as stabilised at the 1,000 ft gate, with gear, flaps, sink rate, glideslope and centreline all within limits. Local weather was 14 °C with wind 2 kt from 170 °, a 2 kt cross-wind component and a 1 kt tail-wind component.
At threshold the aircraft encountered a height of 67 ft agl, which was above the target, and the threshold speed was recorded as good at 149 kt. The flare was executed from this condition.
Touchdown occurred 392 m beyond the touchdown zone with a speed of 148 kt, noted as a little fast, and a firm vertical rate of minus 321 fpm. The touchdown point was slightly off centreline by 7.6 m, and the total landing distance was 1,634 m, representing 66 % of the 2,486 m runway.
During rollout the aircraft remained slightly misaligned, drifting 14.2 m from the centreline before exiting the runway.
To improve future performance, aim to achieve touchdown nearer the 300 m (1,000 ft) aim point and reduce speed to the target VREF to lessen overshoot and rate. Maintaining tighter centreline tracking through flare and rollout will also enhance alignment and runway utilisation.
Scroll or drag the slider to zoom · double-click to reset · hover for values