Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Maintain the centreline
A small uncorrected heading error at 40 knots becomes a metre of offset per second by 100 knots, noticed only at rotation, producing a crabbed liftoff. Root cause is nearly always eyes on the tape instead of the far end of the runway. Small heading changes displace a distant point visibly long before the nearby centreline stripes look wrong.
Read more in Improve Your Take-OffsStart to finish · 18 stages, 16 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Two stabilised approach gates, each with six checks at 1,000 ft and 500 ft above the runway.
The approach, gate by gate
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 3,881 m runway, to the same scale as the side view.
The 406 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Departing Perth International Airport, the Boeing 747-8 began its journey on runway 21, taking off with a takeoff distance of 1,554 meters, which accounted for 45% of the runway. The aircraft lifted off at a speed of 171 knots, overcoming a crosswind of 7 knots and a tailwind of 8 knots. The local weather conditions at the time of departure were characterized by a temperature of 32 degrees Celsius and a wind speed of 11 knots from 329 degrees.
As the aircraft climbed to its cruising altitude, it passed overhead Cloverdale, a town in the state of Western Australia. The enroute climb phase saw the aircraft ascend from 1,040 feet above sea level to 39,015 feet, an increase of 37,975 feet in 22 minutes, covering a distance of 158 nautical miles. The enroute level cruise phase followed, lasting 187 minutes and covering 1,572 nautical miles. The aircraft then began its descent, starting 12 miles west of Oakdale, a town in the state of New South Wales. The descent phase saw the aircraft decrease its altitude from 39,007 feet to 1,012 feet in 20 minutes, covering a distance of 119 nautical miles.
The final approach to runway 16R at Sydney Kingsford Smith International Airport was made from the north, with the aircraft heading 168.0 degrees at 4 nautical miles and 985 feet above ground level. The landing was successful, with the aircraft touching down at a speed of 134 knots and a distance of 409 meters. The touchdown rate was slightly hard at -416 feet per minute, but the runway touchdown alignment was very good. The total landing distance was 1,171 meters, accounting for 30% of the runway. After landing, the aircraft taxied to the parking area, taking 3 minutes to cover a distance of 1 nautical mile. The total flight distance was 1,860 nautical miles, taking 239 minutes and consuming 32,276 kilograms of fuel.
The Boeing 747-8 touched down on runway 16R at YSSY Sydney Kingsford Smith International Airport with a satisfactory approach quality, demonstrating good control and precision throughout the descent. The aircraft descended from 985 ft agl at 4 nm to the threshold, maintaining a steady heading of 168.0°. The threshold height was good, allowing for a smooth transition to the runway.
As the aircraft touched down, it achieved a threshold speed of 139 kt, which was slightly below the target speed. The touchdown distance of 409 m was good, indicating a well-controlled descent. The touchdown speed of 134 kt was also within acceptable limits, and the touchdown rate of -416 fpm was slightly hard, but not excessive. The runway touchdown alignment was very good, with the aircraft centered on the runway. The local weather conditions, with a temperature of 18 °C and a 10 kt headwind, contributed to a stable and predictable approach.
The Boeing 747-8 rolled out on the runway with a total distance of 1,171 m, which accounted for 30% of the runway length. The runway rollout alignment was very good, with the aircraft maintaining its centerline alignment throughout the rollout phase. Overall, the landing was scored 97.0%, reflecting a high level of precision and control throughout the approach, touchdown, and rollout phases.
Scroll or drag the slider to zoom · double-click to reset · hover for values