Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Maintain a smooth pitch
When Vr arrives, an abrupt near-full-scale pull, pitch overshoots, a push, and an oscillation through the first 200 ft. It feels like “this aircraft is twitchy” but the actual fault happened before liftoff. The pitch trace needs to show a clean ramp during liftoff.
Read more in Improve Your Take-OffsStart to finish · 12 stages, 11 scored
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
Two stabilised approach gates, each with seven checks, where the approach path is 1,000 ft and 500 ft above the runway. They are the approach's score: the checks passed out of the checks that ran.
The approach, gate by gate
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 2,490 m runway, to the same scale as the side view.
Touched down 531 m past the threshold — beyond the full-score zone. The arrival was smooth.
The rest of the report
A Phenom 300E aircraft departed from EHGG Groningen Airport Eelde, navigating a northeasterly heading of 231.0° towards the airport. As the aircraft descended towards the runway, it maintained a steady altitude of 1,042 feet above ground level (agl) at a distance of 3 nautical miles from the threshold. The pilot executed a smooth final approach, aligning the aircraft with the runway and preparing for touchdown.
Upon landing on runway 23, the Phenom 300E touched down at a speed of 92 knots, with a touchdown rate of -58 feet per minute (fpm), indicating an excellent rate of descent. The touchdown point was located 109 meters beyond the designated touchdown zone, but the runway touchdown alignment was perfect. The threshold speed of 107 knots was also within the acceptable range, and the local weather conditions, with a temperature of 16°C and a negligible headwind of 1 knot, contributed to a smooth landing. The aircraft's performance was further highlighted by a total landing distance of 962 meters, which accounted for only 39% of the available runway length.
Following the landing, the Phenom 300E executed a go-around from the runway, maintaining a low altitude of 3 feet agl. The aircraft then taxied back to the departure point, having completed a total flight distance of 14 nautical miles in 7 minutes. The flight utilized 37 kilograms of fuel, demonstrating the aircraft's efficiency and performance capabilities. The Phenom 300E's handling and maneuverability were evident throughout the flight, showcasing its suitability for short- to medium-range operations.
The final approach to runway 23 at EHGG Groningen Airport Eelde from the north east was executed with precision, with the aircraft maintaining a heading of 231.0° at 3 nautical miles and 1,042 feet above ground level. The approach quality was excellent, with a good threshold height and a threshold speed of 107 knots, well within the acceptable range. As the aircraft descended onto the runway, it touched down 109 meters beyond the touchdown zone, with a touchdown speed of 92 knots, which was also within the acceptable limits.
The touchdown characteristics were impressive, with a touchdown rate of -58 feet per minute, indicating a smooth and controlled descent. The runway touchdown alignment was perfect, with the aircraft centered on the runway centerline. The local weather conditions, with a temperature of 16°C and a wind of 1 knot at 270°, contributed to a relatively calm and stable environment for the landing. The crosswind and headwind components were minimal, at 1 knot each, further reducing the challenges of the landing.
The rollout phase was equally impressive, with the aircraft maintaining perfect alignment on the runway centerline. The total landing distance of 962 meters, which accounted for 39% of the runway length, was well within the acceptable range. Overall, the landing was executed with precision and control, resulting in a score of 98.5%. The combination of good approach quality, smooth touchdown characteristics, and precise rollout alignment made for a textbook landing.
Scroll or drag the slider to zoom · double-click to reset · hover for values