Flight Score
Hold the cruise
Enroute Level scored 98.79 %. Flown perfectly, with everything else unchanged, this flight scores 99.89 %.
Start to finish · 19 stages, 18 scored
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: five checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out.
Side view — the last 1,524 m of the approach.
Plan view — the first 1,524 m of the 2,447 m runway, to the same scale as the side view.
The 383 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
The flight in the Tecnam P2006T MKII began with a smooth departure roll on runway 28 at LIME Milan Bergamo Airport/Antonio Locatelli Air Base. The takeoff distance was 283 meters, representing 11% of the total runway length. The liftoff speed reached 68 knots, aided by favorable local weather conditions with a temperature of 15°C and minimal wind speeds.
Once airborne, the enroute climb commenced over Orio al Serio in Lombardia, Italy. The aircraft ascended from 1,797 feet above sea level to 9,437 feet, gaining 7,640 feet in altitude over 12 minutes and covering a distance of 23 nautical miles. This ascent phase provided a smooth transition to the level cruise phase over Barlassina, which lasted 2 minutes and covered 4 nautical miles.
The journey continued with an enroute descent over Rovello Porro, during which the aircraft descended from 9,836 feet to 4,878 feet, decreasing altitude by 4,958 feet in 7 minutes and covering 16 nautical miles. Following this descent, the aircraft entered another level cruise phase over Zibido San Giacomo for 9 minutes, covering 11 nautical miles.
As the aircraft approached its destination, the enroute descent began over Pavia, descending from 4,881 feet to 3,423 feet in just 2 minutes over a distance of 5 nautical miles. This descent phase was swiftly followed by another level cruise phase over Cura Carpignano, lasting 6 minutes and covering 8 nautical miles.
The journey concluded with a smooth landing on runway 36 at LIML Milano Linate Airport, which had a runway length of 2,447 meters. The aircraft touched down 381 meters from the threshold at a speed of 54 knots, with a vertical speed indicator reading of -74 ft/m. The local weather at the time of landing included a temperature of 9°C and a wind speed of 4 knots at 245°, with a 3-knot crosswind and a 1-knot tailwind. The total landing distance was 479 meters, representing 20% of the runway's total length.
Overall, the flight covered a total distance of 74 nautical miles, took 56 minutes to complete, and utilized 23 kilograms of fuel. Throughout the journey, the Tecnam P2006T MKII demonstrated excellent performance and efficiency.
Congratulations on achieving an impressive aircraft landing score of 99.7%! Your performance throughout the various phases of the landing process was truly exceptional.
During the Approach Phase, you demonstrated excellent glideslope alignment and maintained a slightly below target speed, which allowed for a smooth transition into the Landing Phase. Your ability to accurately control your aircraft's position in relation to the runway was commendable and likely contributed significantly to your overall score.
As you entered the Landing Phase, your skill in managing the aircraft's threshold height and executing a flawless landing flare was evident. These key elements of the landing process were executed with precision, contributing to a successful touchdown.
In the Touchdown Phase, your touchdown rate was excellent, and you were able to maintain the correct speed upon touchdown, ensuring a smooth and controlled landing. Additionally, your ability to touchdown within the designated touchdown zone with a mere 2.4 meters deviation from the centerline of the runway is a testament to your skill and accuracy as a pilot.
Lastly, as you transitioned into the Rollout Phase, your maintenance of runway alignment was very good, further showcasing your proficiency in handling the aircraft throughout the entire landing process.
Overall, your performance demonstrates a high level of proficiency and dedication to precision flying. Keep up the great work, and continue to hone your skills to maintain such high standards in all future landings. You should be proud of your achievements and use them as motivation to strive for excellence in every aspect of your flying. Great job!