Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
MY FS FLIGHTS
Flight Score
Maintain the centreline
A small uncorrected heading error at 40 knots becomes a metre of offset per second by 100 knots, noticed only at rotation, producing a crabbed liftoff. Root cause is nearly always eyes on the tape instead of the far end of the runway. Small heading changes displace a distant point visibly long before the nearby centreline stripes look wrong.
Read more in Improve Your Take-OffsStart to finish · 24 stages, 23 scored
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
Events
The threshold, the flare and the hold-off. The approach that led to it is the stabilisation gates below.
One stabilised approach gate: five checks where the approach path is 500 ft above the runway. The 1,000 ft gate was not assessed, because the approach did not join final that far out.
Side view — the last 1,002 m of the approach.
Plan view — the full 1,002 m runway, to the same scale as the side view.
The 154 m touchdown sits inside the full-score zone. The arrival was smooth.
The rest of the report
Overall, the aircraft landing score of 91.3% is a very impressive result. Each phase of the landing was carefully evaluated and we can see that there were many positives to take away from the performance.
Starting with the Approach Phase, while there was a slight deviation below the glideslope limit and the speed was slightly below target, this is a common challenge that many pilots face. With practice and focus on maintaining the correct descent path and speed, this can easily be improved.
Moving on to the Landing Phase, it is great to see that the threshold height was good and the landing flare was executed perfectly. These two factors are crucial in ensuring a smooth and safe touchdown.
The Touchdown Phase also had many strengths, with the touchdown rate, speed, and distance all meeting or exceeding expectations. The precise touchdown location on the runway further demonstrates the skill and precision of the pilot.
Finally, the Rollout Phase had a minor deviation in runway alignment, but this can be easily corrected with more practice and attention to detail.
Overall, this landing performance shows great potential and skill. With a positive attitude and continued focus on improving in areas where there are slight deviations, even higher scores can be achieved in the future. Keep up the good work and strive for excellence in every landing.
Scroll or drag the slider to zoom · double-click to reset · hover for values